Substitution of the current flange with an equal plastic component.
Project goals: > 50% reduction of the component cost > 50% reduction of the production lead time > 40% reduction of the component weight
The challenge
Redesigning a component subjected to strong mechanical stress; Realization of the component in a single production phase; Reviewing the geometry and making the component stackable to optimize the packaging.
The solution
Component re-engineering and functional control by FEM analysis; Use of a carbon-reinforced technopolymer; Integration of threaded inserts by overmoulding process; Simple mould with recovery and reuse of the sprue on the production line.